Skip to content
Let's Talk

Shipbuilding IT & DevelopmentCase 07 of 10

Tracking materials across a shipyard with a mobile app

A shipbuilding company

  • RegionKerala
  • ScopeStores and workshops across one yard
  • Timeline5 months
  • MarketsIndia
Download the PDF Discuss a similar project
01

Industry overview

What is shaping shipbuilding

Shipbuilding and maritime services depend on a deep supplier ecosystem, skilled workforce and port infrastructure, with long project cycles and strict standards.

  • Supplier capability limits how fast yards can scale
  • Skilled trades are scarce and ageing
  • Port users judge performance on turnaround and reliability
02

Client background

A shipbuilding company, working in Kerala. Client identity is withheld to protect confidentiality.

Organisation
A shipbuilding company
Sector
Shipbuilding
Team engaged
IT & Development
Services
Custom business applications, Mobile app development, ERP development
03

Client challenge

Steel plates, pipes and fittings were moved between stores and workshops without consistent records. Materials were lost or reordered unnecessarily, delaying work.

04

Research objectives

  • Deliver on the brief: tracking materials across a shipyard with a mobile app.
  • Define requirements and success criteria the solution would be tested against.
  • Deliver a reliable, secure solution the team can run and extend.
05

Target audience

Scope: Stores and workshops across one yard.

Audiences we typically reach in shipbuilding

Shipyards and project managersMarine equipment suppliersSkilled workers and traineesPort users and shipping linesMaritime regulators

06

Geographic coverage

Coverage: Kerala. Market: India.

  • India
07

Research methodology

An iterative delivery approach: discovery, design, build and test in short cycles, with the client reviewing each step.

  1. 1Brief
  2. 2Process mapping
  3. 3Barcode-based app
  4. 4ERP integration
  5. 5Insight

We mapped material flows with stores and production staff, then built a mobile app using barcodes to record receipts, issues, transfers and returns, integrated with the company’s ERP. The app worked offline in areas of the yard with poor connectivity. Storekeepers and supervisors were involved from the first prototype, and the barcode labels were designed to survive outdoor storage and handling.

Custom business applicationsMobile app developmentERP development

08

Sampling strategy

  • Users and stakeholders from every affected team took part in discovery workshops and acceptance testing.
09

Data collection

Brief & design Sampling & set-up Fieldwork Analysis Reporting Indicative split of the 5-month timeline.
  • Requirements were gathered through workshops, process walk-throughs and a review of existing systems and data.
10

Data quality & validation

  • Peer code review on every change
  • Automated and manual testing
  • User-acceptance testing with the client
  • Release checklist and rollback plan
11

Data analysis

  • Usage and performance monitoring after launch
  • Defect and support-ticket trends
  • Process time before and after
12

Key findings

  • Material locations became visible in real time, unnecessary reorders fell and production delays caused by missing materials reduced noticeably.
Offline capability was essential in a yard full of steel structures.
13

Recommendations

  • Build on the core insight: offline capability was essential in a yard full of steel structures.
  • Focus effort where the evidence was strongest: material locations became visible in real time, unnecessary reorders fell and production delays caused by missing materials reduced noticeably.
  • Re-measure after the changes to confirm the effect.
14

Business impact

  • The planning team also used the data to schedule material deliveries closer to when work packages actually needed them, freeing space in crowded stores.

What changed in the business as a result of the work. Impact is described qualitatively.

15

Deliverables & next steps

  • Cleaned data file and data tables
  • Deployed solution with documentation and handover
  • Support and maintenance plan
  • Repeat the measure after changes are in place to track progress.
  • A natural follow-on question: how do port users rate service?

Client identity is withheld to protect confidentiality.

More shipbuilding case studies

  1. 01caseIdentifying local suppliers for a shipyard’s localisation driveA commercial shipyard
  2. 02caseUnderstanding why skilled welders leave shipyardsA shipbuilding and repair company
  3. 03caseWhat ship owners value in a repair yardA ship repair yard
All shipbuilding case studies

Want results like these?

Tell us about your objectives. We'll recommend an approach and confirm feasibility within one working day.

Request a QuoteTalk to an Expert