Semiconductor IT & DevelopmentCase 08 of 10

Securing design data at a chip design centre

A semiconductor design centre

  • RegionHyderabad
  • Scope300 engineers
  • Timeline4 months
  • MarketsIndia
Download the PDF Discuss a similar project
01

Industry overview

What is shaping semiconductor

The semiconductor and electronics manufacturing ecosystem is expanding, bringing new fabs, design centres and suppliers. Talent, supplier readiness and policy support decide its pace.

  • New manufacturing capacity needs a local supplier base
  • Design and fab talent is in high demand
  • Policy incentives shape investment decisions
02

Client background

A semiconductor design centre, working in Hyderabad. Client identity is withheld to protect confidentiality.

Organisation
A semiconductor design centre
Sector
Semiconductor
Team engaged
IT & Development
Services
Cybersecurity services, Cloud & DevOps services, IT consulting
03

Client challenge

The design centre held valuable intellectual property for global clients, who required strict security controls and evidence during audits. Engineers worked across several client programmes, and access had grown informally over time, so some people could see data from projects they no longer worked on.

04

Research objectives

  • Deliver on the brief: securing design data at a chip design centre.
  • Design around the real needs of engineers.
  • Define requirements and success criteria the solution would be tested against.
  • Deliver a reliable, secure solution the team can run and extend.
05

Target audience

The work focused on 300 engineers.

  • engineers300

Audiences we typically reach in semiconductor

Design and manufacturing companiesComponent suppliersEngineers and studentsB2B buyersIndustry bodies

06

Geographic coverage

Coverage: Hyderabad. Market: India.

  • India
07

Research methodology

An iterative delivery approach: discovery, design, build and test in short cycles, with the client reviewing each step.

  1. 1Brief
  2. 2Security assessment
  3. 3Access control redesign
  4. 4Backup and recovery
  5. 5Insight

We assessed infrastructure, access rights and data flows, implemented role-based access, multi-factor authentication, secure remote access and monitored, tested backups, and prepared documentation for client audits. Changes were introduced in stages with engineering leads, and secure remote access was tested with distributed teams before being rolled out to everyone.

Cybersecurity servicesCloud & DevOps servicesIT consulting

08

Sampling strategy

engineers
300
  • Users and stakeholders from every affected team took part in discovery workshops and acceptance testing.
09

Data collection

Discovery Plan & design Build / execute Test & refine Launch & handover Indicative split of the 4-month timeline.
  • Requirements were gathered through workshops, process walk-throughs and a review of existing systems and data.
10

Data quality & validation

  • Peer code review on every change
  • Automated and manual testing
  • User-acceptance testing with the client
  • Release checklist and rollback plan
11

Data analysis

  • Usage and performance monitoring after launch
  • Defect and support-ticket trends
  • Process time before and after
12

Key findings

  • Clear security documentation also shortened onboarding for new client programmes, which often required evidence of controls before work could begin.
Security designed around engineers’ workflows avoided slowing down design work.
13

Recommendations

  • Build on the core insight: security designed around engineers’ workflows avoided slowing down design work.
  • Focus effort where the evidence was strongest: clear security documentation also shortened onboarding for new client programmes, which often required evidence of controls before work could begin.
  • Re-measure after the changes to confirm the effect.
14

Business impact

  • The centre passed client security audits with fewer findings and gained confidence in protecting sensitive designs.

What changed in the business as a result of the work. Impact is described qualitatively.

15

Deliverables & next steps

  • Deployed solution with documentation and handover
  • Support and maintenance plan
  • Repeat the measure after changes are in place to track progress.
  • A natural follow-on question: how effective are policy incentives?

Client identity is withheld to protect confidentiality.

More semiconductor case studies

  1. 01caseMapping the talent pipeline for semiconductor design and manufacturingA state electronics and semiconductor mission
  2. 02caseHow global chip companies choose design service partnersA semiconductor design services company
  3. 03caseAssessing local supply chains for a chip assembly and test facilityAn outsourced semiconductor assembly and test company